I'm ready for my fence, now what?
Some frequently asked questions and a standard time table for what you can expect in the fence installation process.
Matt Price
1/4/20242 min read
Thanks for choosing FFI for your next project, we'll provide an in-depth perspective on the steps and timelines involved in the fence installation process.
Step 1: Initial Consultation and Assessment
The first step in any successful fence installation project is the initial consultation and project overview. During this stage, an FFI representative and client discuss the specific requirements, preferences, and goals of the project. This includes determining the type of fence, materials, design, and any additional features like gates or decorative elements. The contractor also conducts a thorough assessment of the site, considering factors such as terrain, soil conditions, and any potential obstacles. FFI provides free bids for your project and we are always a phone call away.
Timeline: Consultation and assessment will be scheduled at a time/day continent for the customer.
Step 2: Design and Proposal
Once the initial consultation is complete, FFI will email a detailed bid and proposal based on the client's requirements. This includes specifying the type of materials, dimensions, and layout of the fence. The proposal also contains the total cost of the project.
Timeline: 1 to 3 business days
Step 3: Permitting, HOA Approval and Utilities locate
Before any construction begins, it's crucial to obtain the necessary permits, if needed, from local authorities. FFI is responsible for ensuring that the proposed fence complies with zoning regulations and building codes. Depending upon the location of the property the HOA, if applicable, may need give approval for the project. Some HOAs respond quickly, some can take weeks. FFI will also contact utilities locate. This service will identify Gas, water, sewer, power and communication utilities before the job can begin. Utilities locate can take up to 4 business days.
Timeline: 1-2 weeks (dependent on HOA, building department and utilities locate)
Step 3: Contract signing
FFI provides an industry standard contract that protects both parties. An FFI representative will review the contract with the client and be available to answer any questions.
Timeline: 1 day
Step 4: Deposit and Material Procurement
Once the needed approval and permits are obtained, the next step is to procure the necessary materials. This involves ordering the fence panels, posts, gates, and any other components specified in the design. Timely procurement is essential to avoid delays in the construction phase. FFI will request an partial payment or deposit in order to cover the costs of materials as outlined in the contract.
Timeline: 1 day
Step 5: Site Preparation
With the materials on hand, FFI begins preparing the installation site. This may involve clearing vegetation, leveling the ground, and addressing any access issues identified during the initial assessment. Proper site preparation is crucial for a smooth project. It is important to keep any animals and people away from the site during the install process.
Timeline: 1 day to 1 week (depending upon the scope)
Step 6: Construction
The actual construction phase involves installing the fence . This includes setting the posts, attaching the panels, and installing gates and any other accessories. The timeline for construction varies based on the size and complexity of the project, weather conditions and additional material availability.
Timeline: 1-4 weeks (depending on project size)
Step 7: Inspection and Client Approval
After completing the construction, FFI arranges for a final inspection. the client conducts a walk through with FFI to ensure that the finished product aligns with their expectations.
Timeline: 1 day
Conclusion:
Installing a fence involves a series of well-coordinated steps, each playing a crucial role in the overall success of the project. FFI strives to adhere to these steps and timelines to ensure a seamless process, leading to satisfied clients and a reputation for delivering high-quality fencing solutions.
Contacts
info@firstfenceofidaho.com
Socials
Subscribe to our newsletter
(208)810-1669